You can't lay paving slabs straight onto grass and expect them to stay put. For a patio or path, the turf and topsoil come out, and the slabs go onto a compacted sub-base and a mortar bed. Marshalls' sandstone paving guide says to dig to at least 125 mm plus the depth of the paving and to remove all vegetation and topsoil first.
There is one exception. Stepping stones can sit in a lawn, but each one still goes into its own hole with a proper bed underneath. Both methods are covered below. For a small patio, set aside a long weekend for the digging and base work, and another day for the slabs.
- Patio or path: lift the turf, dig out, lay a compacted sub-base, then bed the slabs on mortar.
- Stepping stones across a lawn: dig one hole per stone, add a bed, and set each stone flush with the grass.
- Slabs dropped on the lawn as they are: expect them to rock, sink and grow grass round the edges within one wet Irish winter.
Why grass is not a base for paving
Grass sits on topsoil, and topsoil is soft, full of roots and organic matter, and holds water well. Those qualities suit a lawn and ruin a patio. The roots rot, the soil settles and the slab settles with it. Marshalls is blunt about this in its porcelain paving guide: "Without a proper base, your entire patio of paved area could become loose and unsafe." The same guide tells you to remove any vegetation, roots or topsoil within the marked-out area.
Irish weather makes it worse. Months of steady rain soften the ground under the slab, and a hard frost can shift whatever water is trapped beneath it. On a lawn, slabs sink unevenly and tip at the corners, which is how people end up tripping on their own patio.
- Topsoil compresses under weight and foot traffic.
- Buried grass and roots decompose, leaving hollows under the slab.
- A lawn holds water, so the ground under the slab stays soft for much of the year.
- Grass and weeds creep in from the edges and push up through the joints.
What you need
The hired kit is where most first-timers underestimate the job. The sub-base needs a plate compactor, because stamping on it with a spade won't compact it properly. The rest is ordinary garden and building gear.
Tools
- Spade, shovel and a turf cutter (worth hiring for anything bigger than a few square metres)
- Wheelbarrow, and plenty of trips with it
- Wooden pegs, string line and marker spray
- Long spirit level, plus a straight timber batten
- Plate compactor (hire)
- Rubber mallet, bucket trowel and pointing trowel
- Cement mixer, or a strong back and a mixing board
- Gloves, safety glasses and knee pads
Materials
- Paving slabs. Browse the paving and patio slabs range, or if you like a local stone, the Irish Limestone Paving Slabs, which have a quiet grey-blue tone that sits well beside a green lawn.
- Type 1 sub-base (crushed stone that locks together when compacted)
- Sharp sand and cement for the mortar bed and the pointing
- A slab primer or fine mortar slurry for the backs of natural stone slabs
Order a sample bag before committing to a full patio. Natural stone varies from batch to batch, and a slab that looks warm and honeyed on screen can look very different on a grey November afternoon.
Quantities and depths
The layers stack up like this, taken from Marshalls' sandstone guide: at least 100 mm of compacted sub-base, about 30 mm of mortar bed, then the slab. So you dig roughly 125 to 130 mm, plus the thickness of your slab.
The sums are simple. Area multiplied by depth gives you volume. A 3 m by 3 m patio is 9 m². Nine square metres at 0.1 m of sub-base is 0.9 m³ of type 1. The same area at 0.03 m of mortar bed is 0.27 m³ of mortar. The table assumes a 25 mm slab, so the dig is about 150 mm in total. Change that figure if your slabs are thicker.
| Patio size | Area | Dig depth (25 mm slab) | Soil to remove | Sub-base at 100 mm | Mortar bed at 30 mm |
|---|---|---|---|---|---|
| 3 m x 3 m | 9 m² | about 150 mm | 1.35 m³ | 0.9 m³ | 0.27 m³ |
| 4 m x 3 m | 12 m² | about 150 mm | 1.8 m³ | 1.2 m³ | 0.36 m³ |
| 5 m x 4 m | 20 m² | about 150 mm | 3.0 m³ | 2.0 m³ | 0.6 m³ |
| 6 m x 4 m | 24 m² | about 150 mm | 3.6 m³ | 2.4 m³ | 0.72 m³ |
That soil column catches people out. Three cubic metres of dug-out lawn is a small mountain, and it takes up more room once it's loose. Sort out a skip or a spot at the end of the garden before you start. For your own measurements, the Online Calculator works out quantities from area and depth.
- Order a few more slabs than the bare area needs, to allow for cuts and breakages, and more again if you're laying a complex pattern.
- If your ground is soft or heavy clay, go deeper on the sub-base. Treat 100 mm as the minimum.
Step 1: mark out the area and plan the fall
Peg out the shape, run string lines between the pegs and spray the outline onto the grass. Make the area a little wider than the finished patio so you have room to work at the edges.
Next, decide which way rainwater will run. A patio must never be dead level. Marshalls recommends a fall of 1 in 80 in its porcelain guide, and 1 cm for every 60 cm in its block paving guide. Over a 3 m patio, that works out at somewhere between 37.5 mm (1 in 80) and 50 mm (1 in 60). Run the fall away from the house and towards the lawn or a drain, never towards a wall.
- If the patio is next to the house, the finished surface must sit at least 150 mm below the damp proof course. That's two bricks' worth. Measure down from the DPC and work out your dig from there.
- Set your pegs to the finished height, with the fall built in, so they can guide every later stage.
- Lay the slabs out dry on the grass first if you can. It's the easiest way to check the pattern and reduce cuts.
Step 2: lift the turf and dig out
Cut the turf into strips and roll it up. Good turf is worth keeping to patch bare spots elsewhere in the lawn. Then dig out the topsoil to the depth you worked out. Marshalls says a minimum of 125 mm plus the paving depth, "removing all vegetation and top soil."
Keep going until you reach firm subsoil, even if that means going a bit deeper in places. A soft pocket left here will show up as a dip in the patio a year later.
- Check the depth regularly with a batten laid across the string lines.
- Pull out thick roots by hand, and dandelion and dock taproots especially.
- Keep the base of the dig following the planned fall, not the old slope of the lawn.
- If the hole fills with water after rain, you have a drainage problem. Sort that out before going any further.
Step 3: lay and compact the sub-base
This layer carries the weight of the patio. Lay it in two stages. Marshalls says to "fill and compact a 50mm layer of sub-base material," then repeat so the sub-base "has an overall depth of 100mm."
- Spread the first 50 mm of type 1 evenly across the dig.
- Run the plate compactor over it, several passes in different directions.
- Spread the second 50 mm, rake it to the fall and compact again.
- Check it with the level and batten. The surface should be firm, even, and fall the right way.
Don't rush this stage. A properly compacted sub-base barely takes a footprint. If yours still looks like a gravel path, give it another pass.
Step 4: bed the slabs on mortar
Natural stone goes onto a full mortar bed, not onto dabs of mortar at the corners. Dabs leave gaps underneath, water collects in them, and the slab can crack. The recipe from Marshalls' sandstone guide is:
- Mortar of four parts sand to one part cement, with enough water to make it workable but not sloppy.
- A bed about 30 mm thick, spread over an area slightly bigger than the slab.
- The back of each natural stone slab primed with a proprietary priming product or a fine mortar slurry, so it grips the bed.
- Slabs spaced 8 to 10 mm apart.
Start from a fixed edge or corner, usually against the house or along a string line, and work outwards. Lower each slab gently into place, then tap it down with the rubber mallet until it matches its neighbours and the fall. Check the level across and along every slab, then diagonally across groups of four. It's slow work, and it's meant to be.
Small errors add up across the patio. A slab 2 mm proud looks fine on its own, but three in a row make a ridge. Lift and re-bed anything that won't sit right. Scraping away some mortar is quicker than living with a rocking slab for years.
Step 5: point the joints and leave it to set
Once the bed has firmed up, fill the joints. Marshalls points sandstone with the same 4:1 mortar, pressed well into the gaps and finished neatly with a pointing trowel. Brush off any mortar that gets onto the stone straight away, because cement stains on pale sandstone or limestone are hard to remove later.
- Leave the paving for at least 24 hours before you walk on it.
- Keep an eye on the forecast. Heavy rain on fresh pointing washes it out and can stain the stone, so cover the patio if a downpour is due.
- Avoid laying and pointing when frost is forecast. Mortar that freezes before it cures is weak.
- Re-lay the turf you saved along the edge of the patio so the grass sits just below the paving. That way the mower runs over the edge instead of clipping it.
Stepping stones in a lawn: the exception
This is where "slabs on grass" is actually right. A line of stepping stones across a lawn doesn't need the whole area dug out. Each stone gets its own hole, and the grass grows up to its edges.
| Method | Hole depth | Bed | Suits |
|---|---|---|---|
| Firm stepping stones (Marshalls) | Stone depth plus a type 1 sub-base of 50 to 100 mm, depending on ground | 3:1 mortar on the sub-base | Everyday routes, heavy slabs, soft or wet ground |
| Lighter method (RHS Garden Projects) | Stone depth plus 2.5 cm | 2.5 cm of sand | Small stones, occasional use, firm and well-drained soil |
Put the stones on the grass first and walk the route a few times, adjusting until they fall naturally under your stride. Then cut round each one with a spade, lift it aside, and dig. Set the top of each stone level with the soil, or a touch below it, so the mower blade passes over it.
- On most Irish lawns, which stay wet for much of the year, the firmer Marshalls method is the safer choice.
- Keep the lawn around the stones weeded. Marshalls warns that weeds left too long "can dislodge your stepping stones."
Aftercare in Irish weather
A well-laid natural stone patio needs very little. The main enemies in Ireland are damp, moss and weeds getting into the joints, and a little attention each season keeps them out.
- Sweep regularly, particularly in autumn when wet leaves stain paler stone.
- Pull weeds from the joints while they're small. Our guide to getting rid of weeds in paving covers the options.
- Check the pointing each spring. Repoint any cracked joints before water gets under the slab.
- Go easy with the pressure washer. A stiff brush and water will handle most dirt without blasting out the joints.
FAQs
How do you lay paving slabs on grass?
For a patio, you don't lay them on the grass itself. Lift the turf and topsoil, dig to at least 125 mm plus the slab depth, and compact 100 mm of type 1 sub-base in two layers. Bed each slab on about 30 mm of 4:1 mortar with a fall of 1 in 60 to 1 in 80, then point the joints and leave it for 24 hours.
How do I lay slabs on grass as a beginner?
Start small. A short path or a few stepping stones is a sensible first job before a full patio. Hire a plate compactor rather than skipping compaction, lay the slabs out dry to plan the pattern, and check every slab with a spirit level. Doing it slowly and carefully matters more than doing it quickly.
How do you lay pavers on grass?
The principle is the same as for slabs: take out the turf and soil, then build a compacted sub-base, because grass can't carry the weight. For stepping-stone pavers set into a lawn, dig an individual hole for each one with 50 to 100 mm of type 1 underneath, so each sits level with or slightly below the grass.
Can I put slabs on grass without digging?
You can, but they won't last. Slabs laid directly on a lawn sink and tilt as the soil softens and the grass underneath rots, and grass grows up round the edges. For anything you plan to walk on regularly, dig out and lay a proper base.
Will a slab patio cope with Irish rain and frost?
Yes, if the base is right and the patio has a fall. A compacted sub-base and a full mortar bed leave nowhere for water to collect under the slabs, and a fall of 1 in 60 to 1 in 80 carries rain off the surface. Most problems in wet weather come from skipped base work, not from the stone.
Stone, quantities and advice from Midland Stone
If you're still choosing a stone, the paving and patio slabs range covers limestone, sandstone, slate and ceramic paving. If your ground is sandy rather than a lawn, see our separate guide on laying paving slabs on sand.
- Use the Online Calculator to work out your quantities.
- Order a sample bag to check the colour in your own garden light.
- Landscapers and builders can join the Trade Partner programme.
- Call or use live chat if you're unsure which stone suits your ground. We deliver across Ireland and Northern Ireland.




